Facebook Twitter You Tube
Search
City of Rochester

Midtown Documents and Data

RFPs/RFQs

There are no open RFPs/RFQs at this time.

top

Final Design Report

Midtown Redevelopment Final Design Report
Appendix I - Maps, Plans, Profiles and Typical Sections
Appendix II - Streetscape and Open Space Concepts
Appendix III - Traffic Information
Appendix IV - Midtown Garage Inspection Report
Environmental Impact Letter
Appendix V - Environmental Documentation
Appendix VI - Parking
Appendix VII - Correspondence and Public Input
Appendix VIII - Alternatives Considered and Eliminated
Appendix IX - Areaway Investigation

top

Open Space

Final Public Meeting Presentation, November 1, 2012
Midtown Public Meeting Presentation, October 2012
Catenary Lights
DC Union Row lights
Site Furnishing
Midtown Character Images  

If you have any questions or comments please contact Bret Garwood at garwoodb@cityofrochester.gov.

top

 

Draft Design Report

Midtown Redevelopment Draft Design Report
Appendix I - Maps, Plans, Profiles & Typical Sections
Appendix II - Streetscape Open Space Concepts
Appendix III - Traffic Analysis
Appendix IV - Garage Condition Report
Appendix V - Environmental Documentation
Appendix VI - Parking
Appendix VII - Correspondence
Appendix VIII - Considered and Eliminated Alternatives
Appendix IX - Areaway Investigation

top

Development Plans

Notice to Bidders - Midtown Plaza Demolition and Site Preparation
Bid Date Extended to March 23, 2010
Midtown Tower Development Proposal Unveiled
Construction Fence Plans

top

Renderings/Drawings

Bergmann Virtual Design of PAETEC Building
Midtown Plaza Before and After Demolition Work
Conceptual design of PAETEC Building from E. Main Street

top

Final Generic Environments Impact Statement (FGEIS) Documents

Final Generic Environmental Impact Statement
Final GEIS Appendix A - Intro and Executive Summary
Final GEIS Appendix B - Comment Summary and Disposition Recommendations
Final GEIS Appendix C - Public Comment Summary
Final GEIS Appendix D - Comment Summary: From the Midtown Rising Luncheon
Final GEIS Appendix E - Rochester Midtown Plaza Fiscal and Economic Analysis
Final GEIS Appendix F - Traffic Summary
Final GEIS Appendix G - Draft Letter of Resolution

top

Draft Generic Environments Impact Statement (DGEIS) Documents

Draft Generic Environmental Impact Statement
DGEIS Appendix A - Urban Land Institute Advisory Services Panel Report
DGEIS Appendix B - Rochester Midtown Concept Alternatives
DGEIS Appendix C - Midtown Plaza Feasibility Analysis
DGEIS Appendix D - Block Land Use, Massing and Public Realm Guidelines
DGEIS Appendix E - Utility Report - Site
DGEIS Appendix F - NYSOPRHP Determination of Eligibility
DGEIS Appendix G - Record of NYSOPRHP 1409 Consultation
DGEIS Appendix H - Relevant Agency Correspondence
DGEIS Appendix J - Cultural Resource Management Report - Phase 1A
DGEIS Appendix K - Rochester 2010 - Center City Master Plan
DGEIS Appendix L - Center City Requirements, Base & Design Dist. Maps
DGEIS Appendix M - City Design Dist. Requirements, Main St. & Tower
DGEIS Appendix N - City Midtown Urban Renewal Plan and District Establishment
DGEIS Appendix O - Condition Analysis Report for the Project Area
DGEIS Appendix P - Midtown Building Assessment
DGEIS Appendix Q - Condition Appraisal - Midtown Parking Structure
DGEIS Appendix R - Midtown Plaza Building Utility Inventory
DGEIS Appendix S - Midtown Parking Garage Roof Slab Load Carrying Capacity
DGEIS Appendix T - Comprehensive Downtown Parking Study Rochester NY
DGEIS Appendix U - Parking Planning Study
DGEIS Appendix V - Traffic Assessment
DGEIS Appendix W - 2007 Downtown Charrette Report
DGEIS Appendix X - Survey of Downtown Office Space
DGEIS Appendix Y - Roch. Housing Market Study Recommendations
DGEIS Appendix Z - Survey of Downtown Rental Housing 

top

Asbestos and Hazardous Materials Abatement & Demolition Documents

top

Environmental and Other Regulatory Reviews

National Environmental Policy Act (NEPA) Reviews:

State Environmental Quality Review Act (SEQR) Documents:

State Historic Preservation Office Determination 

top

Other Documents

Windstream - City Agreement
Land Disposition Agreement between the City of Rochester and PAETEC, December 28, 2010
Executed Letter of Resolution, March, 2009
Letter from SHPO Regarding Concurrence of Findings, November 7, 2008
Midtown Building Utility Report, July 16, 2008
Midtown Area Utility Report, July 14, 2008
State Environmental Quality Review Draft Scoping Document, July 2, 2008
Midtown Historic Eligibility, June 9, 2008
Midtown Parking Structure Condition Analysis, May 2008
Cultural Resource Management Report, May 2005
Points of Public Input into Midtown Project

top

The City of Rochester, NY is an Equal Opportunity Employer. | Terms of Use | Accessibility |  Privacy  | Security |  Contact Us 

Translation by WorldLingo