2017 Preventive Maintenance - Contract Group 4

About the Project

This federal and state multi-modal aided project is being administered by the City of Rochester under agreement with the NYSDOT, NYSDOT PIN 4760.45. This project consists of street improvements to five City streets.

  • Browncroft Boulevard (Newcastle Road - Penfield Town Line)
  • Merchants Road (Browncroft Boulevard - Culver Road)
  • Central Park (Portland Avenue - North Goodman Street)
  • Cleveland Street (Hudson Avenue - North Street)
  • Draper Street (North Street - Portland Avenue) 

The scope of the work consists of milling and resurfacing four city streets, including repair of the existing pavement base, resurfacing of adjacent driveway aprons to meet the new street grades, adjustment of water valve and sewer castings, resetting or installing new granite curbs as needed, replacement of hazardous sidewalks, installation of truncated domes at the handicap ramps, installation of pavement markings and replacement of traffic loops. 
 

Schedule

Preliminary Design        Spring 2015 
Final Design      Summer 2015 
Bid   Fall/Winter 2016
Construction   Fall 2017 /Summer 2018 

 

Project Team

Project Management: City of Rochester Dept of Environmental Services
Project Design: LaBella Associates 
This project is partially funded by federal Transportation
Improvement Program funds distributed through the regional transportation improvement program and administered by New York State Department of Transportation.

Project Documents

General Policies & Design Standards 

 

Questions?

If you have questions or just need additional information, contact City project manager, Mr. Tim Hubbard at (585) 428-7154 or email him.