-
Bicycle Boulevards Implementation Project
Harvard Street Meigs St Edgerton St Dartmouth Street Monroe Ave Park Ave Park Avenue Dartmouth St Vick … Park B Vick Park B Park Ave East Ave Portsmouth Terrace East Ave University Ave University Avenue … Clifford Ave Ferncliffe Drive Clifford Ave Fernwood Ave Lakeview Park Lake Ave Archer St Pierpont Street …
-
Turning Point Trailhead Improvements
the existing Turning Point trailhead and parking lot. The Turning Point Park Trail, part of the Genesee …. Since the addition of the boardwalk, the 275 acre nature park has seen a dramatic increase in popularity …. Porous concrete sidewalks will be added to Boxart Street to connect the neighborhood to the park …
-
Active Transportation Plan
Americans Dr. Jim Maddison, Rochester Skate Park Eddie Smith, Disability Rights and Advocacy Joseph Soto … is provided below. June 5: Roc ‘N Roll Community Bike Ride at Genesee Valley Park June 16: Rochester Street … Films at The Little Theater June 17: Zoo Brew at the Seneca Park Zoo June 18: Rochester Harbor Fest …
-
Conkey Corner Park and El Camino Trail
Conkey Corner Park and El Camino Trail …Conkey Corner Park and El Camino Trail Conkey Ave …. and Clifford Ave. Rochester, NY 14621 Conkey Corner Park and El Camino Trail is the result of the dedication …
-
Durand Eastman Beach House and Master Plan
Project Background Durand Eastman Park … was sold to the City by Dr. Henry Durand and George Eastman. The park was formally dedicated on May 22 …, 1909. Construction of a public beach house on the eastern limits of the park was completed in 1919 …
-
Highland Crossing Trail Project
About the Project The Highland Park/Canalway Trail … is intended to: Connect Highland Park with the Erie Canalway Trail and the Genesee Riverway Trail, Provide … a safe pedestrian and bicycle route to Highland Park, Build a cost-effective, context-sensitive …
-
Former Photech Environmental Cleanup
1000 Driving Park Ave Introduction The former Photech … Imaging Site, located at 1000 Driving Park Avenue, is a remediated brownfield site that is ready … industrial park. All former on-site buildings, foundations, and associated subsurface infrastructure were …
-
Urban Trail Linkages- Eastman and Genesee Riverway Trails
: The Eastman Trail: a proposed trail through the Eastman Business Park representing a significant east/west … Point Park: this section is currently mostly on-sidewalk within busy street right-of-way with a portion …
-
West River Wall Improvement - Phase I (Corn Hill Segment)
improving visual and physical connection to the river and creating a new linear park. This has been … to the newly formed park. Berm/Lawn Areas: Over a length of approximately 400 ft. on either side of the new …
-
Guide to Sustainable Practices for Building Owners and Occupants
Transportation Parking Alternate transportation Community-Oriented Services Mixed-use development
…
-
2024 State Touring Routes Project
reductions and parking regulation changes on West Main Street, bicycle accommodations, curb bump-outs …
-
City Hall Green Roof
plants, and may be designed to be used by people as parks. They require maintenance such as watering …
-
Sawdey Way - Building a Green Street
of Driving Park Avenue,” and was a tireless advocate for improvements to public safety in Northwest Rochester …
-
Climate Change Resilience Plan
and respiratory illnesses. Cities are hotter than rural areas because things like roads, buildings, and parking …