About the Project

The City resurfaced a few local streets in 2022 and 2023.  The top 1.5 inches of asphalt was milled off and repaved with a new asphalt surface. Minimal adjustments were made to the pavement elevation as necessary to improve drainage. There was no proposed work to the existing curbs, sidewalks, tree lawn, street signs or driveway aprons. There was no proposed work to any existing utilities, including adjustments. Any required adjustments were made by others after the project was completed.  Eight new sidewalk curb ramps were installed for the streets milled and resurfaced in 2022.

Fall of 2022:

  • Blakeslee St (N Goodman St to Waring Rd)
  • Baywood Ter (Gray St to Blakeslee St)
  • Patt St (Gray St to Blakeslee St)

Spring of 2023:

  • Copeland St (Webster St to Bay St)
  • Le Frois St (Kilmar St to Baird St) - On hold due to private utility work